Monday, January 23, 2006

Slot Them In!

Excess earth on the bottom of the -3 meter were cleared away to prepare the shoring for panel installation.
Upon reaching -3 meter level, the concrete panels for shoring began to be installed. Each panels were slotted in one on top another as the bottom slid down.
A nice verticle embankment after the panels were neatly installed. Next will be the Dewatering!

No comments:

Post a Comment