Saturday, January 7, 2006

Here Comes The Panels

As the H-beams been driven and the surrounding areas been excavated, another phase of the Shoring works started to take place.
Concrete Panels of 1200(w)x1000(h) began to be delivered.Smaller JCB was used to trim further the spaces between the H-beams. In an almost vertical manner, excess sand material were cleared to make way for the installation of the concrete panels.