Excess earth on the bottom of the -3 meter were cleared away to prepare the shoring for panel installation.
Upon reaching -3 meter level, the concrete panels for shoring began to be installed. Each panels were slotted in one on top another as the bottom slid down.
A nice verticle embankment after the panels were neatly installed. Next will be the Dewatering!
As the H-beams been driven and the surrounding areas been excavated, another phase of the Shoring works started to take place.
Concrete Panels of 1200(w)x1000(h) began to be delivered.
Smaller JCB was used to trim further the spaces between the H-beams. In an almost vertical manner, excess sand material were cleared to make way for the installation of the concrete panels.
at
7.1.06
0
comments
As the Crawler moved sideways driving down the H-beams for the shoring, Excavation works commenced from the center portion. The Activities now resembles a real construction site, after many months of idling.
Big Trucks came and gone within a matter of minutes. Just imagine small kids playing in the sandbox by the seaside and scooping large quantity of sand away to dig holes or build sand castles. How easy it was. The same here.
In no time, the site has changed its elevation to -3.00 meter.
at
3.1.06
0
comments
at
1.1.06
0
comments
The Crawler began shoring pile operation by driving 12meter H-beams into the ground along the perimeter of the site. Here was the first test driving of H-beam done in the middle of the site to establish the correct speed and soil bearing conditions.
It took half a day to complete this first stretch. But then please don't look at the trees! We had to 'trim' the trunks and parts that 'interfered' with the vertical locus of the green pile machine hanging from the crawler rig.
at
1.1.06
1 comments
The Big Crawler machine finally arrived to mark the commencement of Shoring and Excavation works. 60% of the site has been approved for earth moving operation by the local authority.
For start, we had to dig and exposed all cables that could be found around the substation area. Digging in the site was not so much a hassle because it were on the open sandy soil. The oil-filled 33kV cables were again big enough to be located.

|